Stanza Building, Colombia

PROJECT

Stanza Building, Colombia

CLIENT

Coninsa y E&D

DESCRIPTION

Shoring of piles with distribution beam RMD300 Load transmission system with Megaprop reinforced single strut with lower truss, which allows large spans with minimal arrows.

LOCATION

PROYECTOS RELACIONADOS

Access to the Port of Cadiz, Cadiz

Shoring of the walls at the level of coronation beam for high loads, using pairs

San Francisco Building, Colombia

Shoring of piles with distribution beam RMD300 Due to the loads, truss was required with

Pep Ventura Station, Barcelona

Megaprop structure with trusses with double upper and lower beams for high load support. Stabilize

L9 Metro, Barcelona

Shoring of walls made with Megaprop, triangular frames and telescopic tensioners.

Mercado de Abastos, Soria

Pile coronation beam shoring system, using Megaprop single strut lightweight system with top truss to

New Underground Vial in the Marina Basin, A Coruña

Shoring of retaining walls using Megaprop quadruple prop for high load support. The system allows

Headquarters of the College of Architects of Madrid.

Megaprop structure with truss of simple upper and lower bead that allows load support for

DO YOU WANT MORE INFORMATION
ABOUT OUR PROJECTS?