Structure with support for piles through Megaprop struts and top grid with standard RMDK beams, which allows the hanging of the formwork for RC concrete slab of dolphin structures.
Thanks to the versatility of the Meccano system with Superslim beams, structures like the one shown are possible, which allow the support for the concreting of the subway slab allowing
The Las Cruces hydroelectric project consists of a RCC dam with a free spillway of 50 m. of height, a tunnel of deviation of 230 m. in length, a pressure
Special truck for concrete of 7,5 m. length by execution phase. Equipped with hoists for demolding, movement of special metallic formwork panels for partially submerged work.