Leon Cathedral

PROJECT

Leon Cathedral

CLIENT

ESOCA

DESCRIPTION

Work platform supported by brackets for restoration.

LOCATION

PROYECTOS RELACIONADOS

Conference Center Doña Letizia, Oviedo

Removal of roof structure made with gantries and Megaprop towers of up to 35 m

Marathon Street, Madrid

Formwork forged with Slimdek, composed of sopandas, portaasopanda and struts up to 6 m., With

Hospital City, Panama

For the execution of the slabs of the largest hopital complex in the country, the

Police Station, Villanueva de la Cañada

The curved Reflex formwork withstands concrete loads of up to 60 KN / m2 and

Arenales del Sol Hotel, Alicante

Structure of Megaprop towers over 25 m height to support canvas of protection of the

Cuelez Vélez treatment plant, Colombia

Light system of Minima wall formwork. It is a modular system by panels that allows

Door of Fontelonga, Ferrol

Structure with Superslim beam for the shoring of slope in risk of detachment. Thanks to

Soho Mall, Panama City, Panama

Slab formwork made with independent panels of the Alshor Plus system and 2 levels of

El Olivillo Building, Cádiz

The building has a W-floor created from different structural modules executed at different times. It

DO YOU WANT MORE INFORMATION
ABOUT OUR PROJECTS?