Pasarela San Antonio, Panamá

PROJECT

Pasarela San Antonio, Panamá

CLIENT

Consorcio L2 Metro

DESCRIPTION

Walkway made with SUPERSLIM standard beams and accessories, with a total length of 35 m and an intermediate support The supports (ends and intermediate) are made with SUPERSLIM towers and the accesses are made with staircases of special manufacture on Kwikstage falsework.

LOCATION

PROYECTOS RELACIONADOS

Change neoprenos Villafría-Rubena

High load lifting system with multiple Megaprop struts, combined with upper hydraulic system that allows

Ramps exhibitions

Examples of RAMP structures made with Superslim beams for exhibitions of off-road vehicles for temporary

Arcelor factory, Romania

Megaprop high-load derrick towers for Dowcomer 60 m. of height and loads of 600 Ton

Office of the Materials Park of INCYE, Torrejon del Rey

Composed mainly of Superslim beams, Maxima panels and other INCYE products.

Stade Velodrome de Marseille, Francia

Deck shoring made with Megaprop towers of up to 50 m. of height for the

Tower and Marquee for gas station, Leon

The versatility of the Superslim meccano allows the creation of structures for advertising support towers

DO YOU WANT MORE INFORMATION
ABOUT OUR PROJECTS?