Tiered Bridge South Round, Talavera

PROJECT

Tiered Bridge South Round, Talavera

CLIENT

Sacyr, Aglomancha, J. Barcenas

DESCRIPTION

Innovative support system with Megaprop struts in “W” that takes the load of the full width of the board (36m) to supports centered on the foundations of the 2 temporary central piles, thus minimizing the need for foundations in the Tajo River channel .

LOCATION

PROYECTOS RELACIONADOS

Bridge of the Third Millennium, Zaragoza

Structure of shoring towers and gantry system Megaprop of formwork support composed of Superslim and

El Bosque Bridge, Colombia

Multiple porticoed structure of RMDK standard profiling, supported on Megaprop towers and load scaffolding for

Bridge over the Guadalfeo River, Granada

Formwork, curved Kwistage formwork and gantry with R700 trusses for spans up to 40 m.

Bridge over the Ozama River, Santo Domingo, Dominican R.

Support beam of board on pylons with Megatrus latticework and formwork with Superslim beams and

Vía Rápida Camara de Lobos, Madeira, Portugal

Example of combination of different solutions to support porticoed system. With Megaprop towers that, depending

Viaduct Basagoiti, Mondragon

“V” stack formwork formed by Superslim and T200 beams. Falsework consisting of R700 trusses and

Vto. Vto. Palacios, LAV Madrid- Galicia Tr. Cernadilla- Pedralba

Kwikstage formwork system as a support for shuttering ships formed by Superslim and T200 beams

Duques de Alba, Santander

Structure with support for piles through Megaprop struts and top grid with standard RMDK beams,

Station 5 de Mayo, L1 Metro, Panama

Thanks to the versatility of the Meccano system with Superslim beams, structures like the one

Las Cruces Dam, Panama

The Las Cruces hydroelectric project consists of a RCC dam with a free spillway of

Hyperronda of Malaga

Megaprop structure hung in stack for on-site execution of the upper lintel.

New access to Cordoba Airport

Apeo de arco metálico realizado con torres Megaprop de hasta 32 m.Metallic arch shoring made

Pedestrian footbridge over rail, Montmeló, Barcelona

Pedestrian footbridge of 33 m length made with H33 truss and Kwikstage falsework.

Reina Sofía Dam, Las Palmas de Gran Canaria

Special truck for concrete of 7,5 m. length by execution phase. Equipped with hoists for

Port of Motril, Granada

Friction clamp for movement of blocks of 60 and 90 Tn.

Sierrapando tunnel, Var. Torrelavega

Special metal formwork and movement trolley with external traction, with pneumatic vibrators for tunnel lining.

Viaduct of Portos, Orense

Climbing formwork for stacks up to 70 m. of height with advance of 5 m.

Viaducto Pintor Fierros, Asturias

Wing carriage for widening of the viaduct board, with traffic maintenance. Structure composed of Superslim,