Tiered Bridge South Round, Talavera

Description

Innovative support system with Megaprop struts in “W” that takes the load of the full width of the board (36m) to supports centered on the foundations of the 2 temporary central piles, thus minimizing the need for foundations in the Tajo River channel .

Head Office