La Florida Avenue in Oviedo

Description

Shoring of basement walls executed by segements. The PIPERSHOR system was proposed because, although they were medium loads (225 kN/m in the area of the adjoining building and 70 kN/m in the rest), it was important to leave enough free space between props to allow the lowering of the hollow-core slabs that constituted the basement floor.

The longest prop has a length of 20 meters without the need to brace it against another element.

Head Office