Transformation of the old Las Arenas bullring into a shopping center. Façade retention system in the form of a ring that braces the façade covering a diameter of 100 m and a height of approximately 16 m.
The solution adopted was quite complex, since the outer legs of the retention towers had to rest on piles situated quite far from the façade and located at certain points, while the inner legs fell onto perimetral concrete beams that braced the façade at its base like a sandwich.
The structure comprised Superslim and Megaprop equipment, with 36 retention towers supported at the indicated points. The towers were connected to the façade through 3 levels of belts, thus stabilizing the bullring’s 5,000m² façade. All towers were triangular in plan in order to adapt to the special support conditions.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.
This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.
Keeping this cookie enabled helps us to improve our website.
Please enable Strictly Necessary Cookies first so that we can save your preferences!